فهم إجراءات تشغيل الجرافة
1.Preparation: Before using the bulldozer, inspection and preparation work must be carried out. This includes checking that the hydraulic oil, hydraulic system, transmission system, and other equipment are functioning properly, and starting the engine.
2.Positioning: Move the bulldozer to the desired work location and stabilize it using the control levers and pedals.
3.Excavation Operation: Control the hydraulic system to make the bulldozer bucket excavate.
4.Bulldozing Operation: Control the hydraulic system and drive wheels to move the bulldozer forward and the bucket to complete the bulldozing operation.
5.Leveling Operation: Adjust the bucket tilt angle and control the drive wheels to make the bulldozer level the land.
6.Bucket Recovery: After completing the work, recover the bucket, turn off the engine, and perform equipment maintenance.

